News & Events

 

23/08/2006
Colourful Solution for Waterloo Mosaic
03/07/2006
Johnson Takes Off

 

Material & Safety Data Sheets

All datasheets are saved as pdf files, to view these you can download a free copy of Adobe Reader.
Get Adobe Reader

News

 

03/07/2006

Johnson Takes Off

 

Against strong local and international competition, H&R Johnson have recently won a multi – million dollar contract for the supply of tiles and adhesives to the new
terminal construction, Concourse 2 and Terminal 3 at Dubai International airport. The tiles, which have been specified from the Kerastar floor, Prismatics and Architectural wall ranges are being dual sourced out of the U.K. and the Johnson Philkeram plant in Greece. A complete adhesives and grouting system is also included within the scope of supply as are background preparation products. A one part flexible white adhesive and a high performance Johnson Professional epoxy grout form the two principle products within the fixing specification. Commenting on the success, H&R Johnson's Middle East manager Pieter Van Herpen says “ this contract award marks the first major international breakthrough for the new Johnson tile and adhesive partnership. It was important to the design consultants to achieve a high level of performance and technical support for both the tile and adhesive, and this we have been able to achieve with the combination of our product groups.”

 

Back to News